Our team assessed existing drainage and designed a suitable court that efficiently channels water to the current infrastructure. This was a comprehensive design-and-build project directly commissioned by the school.
To minimise soil removal, we proposed constructing an earth bund, reducing carting costs and providing a practical feature for children to sit and play on.