Roydvale School

We were engaged by the MOE to construct the new court

After being appointed as the winning tenderer, we did a topo survey of the areas adjacent to the new court as the new court ties into the existing surfaces around it. We found some minor challenges with drainage of surface water, so we made some proposals to the school & landscape architect for consideration.

After some minor changes, the court was constructed and to a high standard with no surface water ponding on any of the areas.