We were engaged to construct an exposed agg footpath around the back of 80 Valley road. Upgrade the driveway & Right of Way.
Project description:
Demolition and removal of existing 22m2 paved pathway around back of building. All works consisted of wheelbarrow removal due to access constraints.
15m concrete v-channel
New down pipe connection to existing urbanware pipe
CCTV to confirm condition of existing pipework
Installation of 40m of sub soil drain along ROW
100m of trenching for new data cables and water supply
45m2 of Exposed agg driveway
300m3 of driveway upgrade, relevelling