Prior to starting work, we topo surveyed the whole area surrounding the driveway to confirm falls and water flow paths.
Scope:
398m new nib kerbs to SD602
Remove unsuitable soils/gravels.
Construct compacted subgrade material
Asphalt 643m2 of new driveway