135 Jeffs Drain Road

Prior to starting work, we topo surveyed the whole area surrounding the driveway to confirm falls and water flow paths.

Scope:

398m new nib kerbs to SD602

Remove unsuitable soils/gravels.

Construct compacted subgrade material

Asphalt 643m2 of new driveway